Air Vent Technology overcame three major challenges to design and install a state-of-the-art bespoke AHU for a military training site.
Challenge
Military facilities demand the highest possible standards in every aspect. So when Air Vent Technology was approached to design and supply a bespoke air handling unit (AHU) for a new Armed Forces training facility, our team was delighted to accept the project.
The unit was to be located in a new building which, at the start of this process, had yet to be constructed. That meant all specifications had to be finalised remotely, requiring seamless collaboration between Air Vent Technology, our customer (Air Systems SW Ltd), and the end client.
There were several challenges to be overcome.
First, the building was scheduled to be used for several operational scenarios, so flexible ventilation strategies had to be incorporated to respond to varying needs.
Second, the designated AHU footprint within the new building was highly constrained. The AHU needed to provide a large airflow capacity (8m³/s) within a limited area of 8000mm x 5000mm.
Finally, the system had to meet strict energy efficiency requirements, ensuring low power consumption and heat recovery efficiency above 73%.
Solution
Air Vent Technology worked closely with all stakeholders to develop a bespoke AHU from our STP product range. At every stage, our expert consultants consistently worked to ensure all necessary components were included – regardless of any space limitations.
This care and attention to detail built trust and goodwill, which were enhanced even further by continuous and extensive discussions at every stage of the design phase.
Our experience and know-how in custom engineering enabled us to create a high-performance unit that met all efficiency targets while optimizing airflow.
To facilitate installation, the AHU was delivered in modular form. Our team then oversaw on-site assembly using a “bolt-up” method. The building itself was constructed around the installed unit, with other services and access routes planned accordingly.
Results
The bespoke AHU was successfully briefed, commissioned, designed, delivered, and fully assembled in just 12 months.
The unit meets all required airflow, efficiency, and control specifications, giving the Armed Forces all the ventilation it needs as part of its brand-new training facility.
Air Systems SW Ltd was delighted with our ability to develop a tailored solution where others could not, reinforcing its trust in Air Vent Technology’s expertise and innovation in bespoke ventilation design.
Project
Bespoke Armed Forces AHU
Sector
Commercial
Products
Location
Military Training Force
Learn more about our products and how they can work for you by getting in touch today
Tel: 012643 56415
Email: enquiries@airventtechnology.co.uk