Search
Air Vent Technology brought innovation, knowledge, and expertise to Bristol Airport’s huge development programme.
Challenge
As part of a £400m transformation project at Bristol Airport, Air Systems SW Ltd was tasked with ventilating a new area in the expanded facility.
Specific component requirements meant the project had escalated in complexity. Rather than a standard heat recovery unit, Air Systems SW Ltd instead required a bespoke AHU solution capable of delivering against precise filtration, airflow, noise, and size requirements.
Solution
Air Systems SW Ltd immediately sought support from Air Vent Technology. This decision was fuelled by our previous experience designing and supplying several ventilation systems for the same airport expansion project.
Our expert team steered a series of discussions to determine the precise project scope, identify any unforeseen challenges, and deliver a solution tailored to the exact requirements demanded by both Air Systems SW Ltd and Bristol Airport.
Results
Air Vent Technology successfully met all design and performance requirements with its bespoke AHU solution.
Internal carbon and grease filters ensured the unit met specific filtration standards. Internal attenuation kept operational noise levels acceptably low. And, by keeping everything contained under a strict height limitation, our design team ensured the unit was not visible above any part of the airport’s roofline.
Both Air Systems SW Ltd and Bristol Airport were delighted with the end result, maintaining the exceptional standards of the overall airport expansion project and ensuring travellers will pass through the new facility in comfort for many years to come.
Project
Airport Expansion
Sector
Commercial
Products
Location
Bristol Aiport
Learn more about our products and how they can work for you by getting in touch today
Tel: 012643 56415
Email: enquiries@airventtechnology.co.uk